April 10 Trail Work Thanks

pixychick

JORBA: Ringwood
JORBA.ORG
Art and I would like to thank all our volunteers from April 10 trail building session at Ringwood. The work accomplished far exceeded expectations. 21 volunteers worked 84 hours. The trail crossed a talus field with several streams intersecting. The trail was slightly re-routed to higher ground and numerous armored sections were set in place. What was expected to take several work days was done in one, and trail markers were moved to the new trail, and it is open for traffic. A big thanks to our energetic workers:

Joe Benevento
Ty Benevento
Joaquin Conizales
Jeffrey Dodd
Leigh Dodd
Bill Dove
Tim Egan
Chris Giratti
Henry Gozdz
Steve Kleiber
Dan Matthews
Kathy Maziarz
Chris Michaloski
Darlene Phillips
Michael Rossi
Marianne Santangelo
Jennel Santos
Steve Wagoner
Joey Wyckoff


Art and Ellen White
Jorba.org
 

Attachments

  • armor1.jpg
    armor1.jpg
    190.2 KB · Views: 519
  • armor2.jpg
    armor2.jpg
    224.9 KB · Views: 521
  • armor3.jpg
    armor3.jpg
    204.9 KB · Views: 513
  • bench.jpg
    bench.jpg
    231.7 KB · Views: 512
  • crossing.jpg
    crossing.jpg
    222.1 KB · Views: 532

Trail Conditions

Current Conditions

powered by Trailforks.com
Back
Top Bottom